Ashford and St. Peter’s Hospital

MSS were selected as the specialist contractor for the design and installation of a new twin Cardiac Catheter Lab and 12 Bed Recovery Ward.

The modular building, linked to the existing wards, was required to match the external appearance by the local planning department and was constructed on a fast track basis, following an upfront design period by MSS.

MSS selected factory engineered off site modules designed to exact dimensions to provide the extension. These units were craned into position over a weekend to minimise any disruption to the hospital facilities.

MSS completed the internal fit out, civils, HVAC and electrical services, including extending the existing infrastructure services and coordinated all activities with the specialist equipment supplier.

Who we work with