MSS has provided clients with turnkey projects that include the
host building.
We can provide traditional construction methods as well as factory- engineered modular buildings.
Utilising this method of build the shell is fabricated in the factory whilst the ground works and drainage are installed on site.
As soon as the ground works are complete the building is delivered to site, erected within days, weather tight and ready for the internal fit out to commence immediately.
Facilities MSS have provided include: -
» Research Laboratories
» Containment Suites
» Microbiology Laboratories
» Cleanrooms – ISO 7 – 8
» Offices
Aesthetically pleasing designs and finishes are available to blend in with any surrounding environment and meet strict planning requirements.
From design through to hand over can be as quick as 6-12 months (60m² ISO 7 / 275m² - CAT 3/4)
|