Pharmaceutical Production - UK

 

This project was procured on an open book basis with each of the four key contractors along with the client forming an alliance, the objective of which was to work together openly and in the best interests of the project. Key drivers being to accelerate the construction period from what a normally procured project might be, at the same time increasing control on cost and quality.

 

  Location:
  UK
  Air Classification:
  Containment
  MSS Product:
  MSS Concept Ceiling &

  Wall System
  Role of MSS:
  Cleanroom Fabric